New pressure-treated dock decking and a covered slip on a west Georgia lake, with boathouses across the cove

Heard County, Georgia

Heard County decks, docks and fences

Built to the county code in Franklin and out in the county, and to the Corps plan on the West Point Lake shoreline.

  • 17+ years in the trade
  • Based in Villa Rica, GA

The short answer

Yes, and it starts with a county permit.

We build decks, docks, fences, screened porches and remodels in Heard County. A deck or addition needs a county building permit, and a dock on West Point Lake needs a Corps of Engineers permit on top of that.

Heard also has flood, stream and historic-area rules, and Franklin runs its own zoning inside city limits. Send Ambrose a quote request with the address and we will tell you which apply before you file.

The rules

What Heard County and Franklin require.

Each rule comes from the Heard County code, the Franklin zoning ordinance or the Corps plan for West Point Lake, and links to its section. Offices read their own codes, so confirm your lot before you pay anyone.

The county permit

Fences and floodplain

Streams and the Chattahoochee

West Point Lake shoreline

  • Georgia's share of West Point Lake lies in Troup and Heard Counties. Of its 525 miles of shoreline, only about 133 (25.3 percent) are allocated Limited Development, the one category where private floating facilities may be authorized, and only with a permit.

    Shoreline Management Plan, sections 5 and 8

  • The project land includes a 300 to 500 foot buffer around the lake. The Corps cannot guarantee its boundary pins and tells a neighboring owner to hire a licensed surveyor first.

    Shoreline Management Plan, sections 5 and 20

Inside Franklin

  • Franklin defines a structure as "anything constructed or erected on the ground or attached to something on the ground." A fence or a wall is not a structure. That definition would cover a deck.

    Franklin Zoning Ordinance, 3.3

  • A fence or freestanding wall in a required yard stops at eight feet, retaining walls excepted. On a corner lot, nothing over three feet tall may block the view at the intersection.

    Franklin Zoning Ordinance, 7.2-5Franklin Zoning Ordinance, 7.3

  • The Historic Neighborhood Overlay covers new construction, additions that add floor space, relocation and demolition. New construction means "the fabrication or placement of any building or other structure on a lot." The text does not name decks, so ask the city whether yours needs review.

    Franklin Zoning Ordinance, 8.3 and 8.4-2

  • If it applies, the City Council decides. On matters of new construction or building additions, silence from the Historic Preservation Commission for 45 days counts as approval.

    Franklin Zoning Ordinance, 8.6-2 and 8.6-6

What we build

Decks, docks and fences for Heard County lots.

These are the jobs we take on across west Georgia. The photos show our regional work, not Heard County addresses.

Gray composite dock walkway beside covered boat slips with pontoon boats moored on a lakeCompleted

Docks and boathouses

Floating docks, lifts and boathouses for the West Point Lake shoreline, planned to the Corps limits.

New stained wood deck with wraparound rail and staircase on a two-story house with a green metal roofCompleted

Decks

New decks and rebuilds in pressure-treated lumber or composite, with rail, stairs and staining.

Long new pressure-treated wood privacy fence running along a sloped back yardCompleted

Fences

Wood privacy and farm fences, built with water gaps where a creek or the flood district calls for them.

Screened porches and remodels

Screened porches, kitchens and bathrooms for homes in Franklin and out in the county.

How it goes

From the first call to the finished job.

  1. Send the address

    We check the zoning, the flood district and any stream, river or lake rule that touches the lot.

  2. Plan to the rules

    Setbacks, buffers, water gaps and the Corps allocation of your shoreline decide what the plan can show.

  3. Permit

    The county or Franklin issues the building permit. A dock adds the Corps permit.

  4. Build and sign-off

    Work starts after the permit is in hand, then the inspection the permit calls for.

Questions

Straight answers.

Do I need a permit to build a deck in Heard County?

Almost always. The county bars building or adding to a structure without a building permit, and the permit waits on board of health approval of your water and sewage plans.

Can I build a dock on my West Point Lake lot in Heard County?

Only on shoreline the Corps allocates as Limited Development, about a quarter of the lake, and only with a Corps permit. The size and plan rules are on our West Point Lake dock page.

Can I fence a yard that floods or borders a creek?

In the flood hazard district a fence is allowed if it does not materially block floodwater, and water gaps are allowed. Near the Chattahoochee or the two watershed creeks, buffer rules can also limit what goes near the water.

Does Franklin have different rules from the rest of Heard County?

Yes. Inside city limits the Franklin zoning ordinance governs. Outside the city it is the county code.

Building in Heard County?

Send Ambrose a quote request. Tell us the lot and what you want, and we will tell you which rules apply.

Mon to Fri 8am to 6pm, Sat 8am to 1pm, closed Sunday